The general contractor shall provide dedicated building closets, equipment backboards, wire management supports, termination racks, a grounding system, and an Outside Plant (OSP) conduit with pull ropes from the Building Distribution Frame (BDF) to nearest manhole. Junction boxes shall be provided to allow installation of termination jacks at each station. The general building contractor shall provide Inside Plant (ISP) pathways, which may include accessible utility corridors, finished and exposed metal cable tray or ladder, enclosed conduit, duct, or raceway including pull ropes to allow the installation of cable. All cabling for voice and data will be CAT6.The following text describes all information shown on the Appendix B – Section 27 00 00 Communications PDF found on the Capital Planning Construction Design Documents page.Īppendix B – Section 27 00 00 Communications Part 1 General 1.01 Description European Union’s General Data Protection Regulations (GDPR).University of Maine System (UMS) Offices.State Authorization & Certification Information.European Union’s General Data Protection Regulation (GDPR).System Policies, Procedures & Financial Reports.Guidelines for Board & Committee Meetings.Committee Responsibilities and Membership.Board of Trustees Strategic Initiatives.